| 130 |
HSE1 |
Accident & Injury Prevention for Petroleum Worker |
5 days |
Health, Safety & Environment |
| 131 |
HSE2 |
Advance Management of Environmental Service
|
5 days |
Health, Safety & Environment |
| 132 |
HSE3 |
Advanced Accident Investigation & Reporting |
5 days |
Health, Safety & Environment |
| 133 |
HSE4 |
Advanced Fire Safety Management Training |
5 days |
Health, Safety & Environment |
| 134 |
HSE5 |
Advanced Health & Safety Management |
5 days |
Health, Safety & Environment |
| 135 |
HSE6 |
Advanced Operation & Safety Practices in Terminals Handling Ships Carrying Liquefied Gases in Bulk |
5 days |
Health, Safety & Environment |
| 136 |
HSE7 |
Advanced Principles in Ports & Marine Terminals Management, Operations & Safety |
5 days |
Health, Safety & Environment |
| 137 |
HSE8 |
Advanced Safety Leadership |
5 days |
Health, Safety & Environment |
| 138 |
HSE9 |
Aerial Surveillance |
5 days |
Health, Safety & Environment |
| 139 |
HSE10 |
Air Pollution Control & Modeling in Petrochemical Industry |
5 days |
Health, Safety & Environment |
| 140 |
HSE11 |
Applying HACCP Principles for the Food Service Industry |
5 days |
Health, Safety & Environment |
| 141 |
HSE12 |
Auditing Oil & Gas Industry Quality Management Systems |
5 days |
Health, Safety & Environment |
| 142 |
HSE13 |
Basic Fire Fighting Workshop |
5 days |
Health, Safety & Environment |
| 143 |
HSE14 |
Basic Life Support (BLS) |
5 days |
Health, Safety & Environment |
| 144 |
HSE15 |
Basic of Security Officer to Petroleum Industry |
5 days |
Health, Safety & Environment |
| 145 |
HSE16 |
Best Practice in Sewage & Industrial Wastewater Treatment & Environmental Protection |
5 days |
Health, Safety & Environment |
| 146 |
HSE17 |
Carbon Capture, Utilization and Storage (CCUS) |
5 days |
Health, Safety & Environment |
| 147 |
HSE18 |
Carbon Management |
5 days |
Health, Safety & Environment |
| 148 |
HSE19 |
Construction HSE Hazards |
5 days |
Health, Safety & Environment |
| 149 |
HSE20 |
Contractor Safety Management |
5 days |
Health, Safety & Environment |
| 150 |
HSE21 |
Corporate Health & Wellness |
5 days |
Health, Safety & Environment |
| 151 |
HSE22 |
Corporate Risk & Crisis Management |
5 days |
Health, Safety & Environment |
| 152 |
HSE23 |
Defensive driving |
5 days |
Health, Safety & Environment |
| 153 |
HSE24 |
Designing & Implementing an Occupational Health & Safety Management System (OHSMS) |
5 days |
Health, Safety & Environment |
| 154 |
HSE25 |
Developing an Effective Safety Culture |
5 days |
Health, Safety & Environment |
| 155 |
HSE26 |
Developing and Sustaining an Effective Safety Culture |
5 days |
Health, Safety & Environment |
| 156 |
HSE27 |
Developing Intelligence in a Corporate Security Environment |
5 days |
Health, Safety & Environment |
| 157 |
HSE28 |
Emergency Dispatch & Control Center Operation |
5 days |
Health, Safety & Environment |
| 158 |
HSE29 |
Emergency First Aid with CPR |
5 days |
Health, Safety & Environment |
| 159 |
HSE30 |
Emergency Response Management: Planning, Leadership & Communication |
5 days |
Health, Safety & Environment |
| 160 |
HSE31 |
Emergency Response On-Scene Command Management |
5 days |
Health, Safety & Environment |
| 161 |
HSE32 |
Energy Conservation Techniques & Technology for Industry |
5 days |
Health, Safety & Environment |
| 162 |
HSE33 |
Energy Isolation |
5 days |
Health, Safety & Environment |
| 163 |
HSE34 |
Energy Transition and Innovation |
5 days |
Health, Safety & Environment |
| 164 |
HSE35 |
Environmental Awareness |
5 days |
Health, Safety & Environment |
| 165 |
HSE36 |
Environmental Benchmarking |
5 days |
Health, Safety & Environment |
| 166 |
HSE37 |
Environmental Impact Assessment |
5 days |
Health, Safety & Environment |
| 167 |
HSE38 |
Environmental Management & Waste Treatment |
5 days |
Health, Safety & Environment |
| 168 |
HSE39 |
Environmental Protection by Energy Saving for Power Plants |
5 days |
Health, Safety & Environment |
| 169 |
HSE40 |
Environmental Waste Management |
5 days |
Health, Safety & Environment |
| 170 |
HSE41 |
Fire Fighting & Rescue in Process Plants |
5 days |
Health, Safety & Environment |
| 171 |
HSE42 |
Fire Prevention, Protection & Safety on Power Plants |
5 days |
Health, Safety & Environment |
| 172 |
HSE43 |
Food Safety & Quality Management |
5 days |
Health, Safety & Environment |
| 173 |
HSE44 |
Fundamentals of Decarbonization |
5 days |
Health, Safety & Environment |
| 174 |
HSE45 |
Garden Inspection |
5 days |
Health, Safety & Environment |
| 175 |
HSE46 |
Garden Management |
5 days |
Health, Safety & Environment |
| 176 |
HSE47 |
Gas Explosion and Other Hazards of LNG Facilities |
5 days |
Health, Safety & Environment |
| 177 |
HSE48 |
Hazard Communication (HAZCOM) for the Oil & Gas Industry |
5 days |
Health, Safety & Environment |
| 178 |
HSE49 |
Hazardous & non-Hazardous Waste Management |
5 days |
Health, Safety & Environment |
| 179 |
HSE50 |
Hazardous Chemicals: Handling, Storage, Disposal, Monitoring & Response |
5 days |
Health, Safety & Environment |
| 180 |
HSE51 |
Hazardous Waste Management & Pollution |
5 days |
Health, Safety & Environment |
| 181 |
HSE52 |
Hazards, Technology, Operation, and Economics for LNG |
5 days |
Health, Safety & Environment |
| 182 |
HSE53 |
HAZMAT & HAZCOM: Hazardous Materials & Chemicals Handling, Storage, Disposal, Monitoring & Response |
5 days |
Health, Safety & Environment |
| 183 |
HSE54 |
HAZOP Study for Team Leader |
5 days |
Health, Safety & Environment |
| 184 |
HSE55 |
ICS 100 Incident Command System |
5 days |
Health, Safety & Environment |
| 185 |
HSE56 |
ICS 200 Incident Command System |
5 days |
Health, Safety & Environment |
| 186 |
HSE57 |
ICS 300 Incident Command System |
5 days |
Health, Safety & Environment |
| 187 |
HSE58 |
IMO Model Training Course on Oil Pollution Preparedness, Response and Co-operation (OPRC) Level 1 - First Responders |
5 days |
Health, Safety & Environment |
| 188 |
HSE59 |
IMO Model Training Course on Oil Pollution Preparedness, Response and Co-operation (OPRC) Level 2 - Supervisors and
On-Scene Commanders |
5 days |
Health, Safety & Environment |
| 189 |
HSE60 |
IMO Model Training Course on Oil Pollution Preparedness, Response and Co-operation (OPRC) Level 3 - Senior Managers
and Administrators |
5 days |
Health, Safety & Environment |
| 190 |
HSE61 |
IMO Model Training Course on ORPC |
5 days |
Health, Safety & Environment |
| 191 |
HSE62 |
Incident & Accident Investigations of Root Cause & Analysis |
5 days |
Health, Safety & Environment |
| 192 |
HSE63 |
Incident & Crisis Response Communication Skills |
5 days |
Health, Safety & Environment |
| 193 |
HSE64 |
Incident Command System |
5 days |
Health, Safety & Environment |
| 194 |
HSE65 |
Industrial Fire Fighting |
5 days |
Health, Safety & Environment |
| 195 |
HSE66 |
Industrial Occupational Health Monitoring & Management |
5 days |
Health, Safety & Environment |
| 196 |
HSE67 |
Industrial Safety in Oil and Gas Industry |
5 days |
Health, Safety & Environment |
| 197 |
HSE68 |
Integration of HSE & QMS Management Systems |
5 days |
Health, Safety & Environment |
| 198 |
HSE69 |
International Maritime Dangerous Goods Training: Understanding the Purpose of the IMDG code |
5 days |
Health, Safety & Environment |
| 199 |
HSE70 |
International Safety Management (ISM) Code Familiarization for Maritime & Offshore Oil and Gas Professionals |
5 days |
Health, Safety & Environment |
| 200 |
HSE71 |
IOSH Managing Safely |
5 days |
Health, Safety & Environment |
| 201 |
HSE72 |
IOSH Working Safely |
5 days |
Health, Safety & Environment |
| 202 |
HSE73 |
Lock-out / Tag-out |
5 days |
Health, Safety & Environment |
| 203 |
HSE74 |
Low Carbon Development |
5 days |
Health, Safety & Environment |
| 204 |
HSE75 |
Major Emergency Response Management |
5 days |
Health, Safety & Environment |
| 205 |
HSE76 |
Management Systems Auditor Training |
5 days |
Health, Safety & Environment |
| 206 |
HSE77 |
Managing Security Risks in the Oil and Gas Industry |
5 days |
Health, Safety & Environment |
| 207 |
HSE78 |
Marine Environment Protection |
5 days |
Health, Safety & Environment |
| 208 |
HSE79 |
Marine Pollution Management Fundamentals |
5 days |
Health, Safety & Environment |
| 209 |
HSE80 |
Maritime Security Management & Control as per ISPS Code |
5 days |
Health, Safety & Environment |
| 210 |
HSE81 |
NEBOSH Award in Health & Safety at Work |
5 days |
Health, Safety & Environment |
| 211 |
HSE82 |
NEBOSH Fire Safety & Risk Management |
5 days |
Health, Safety & Environment |
| 212 |
HSE83 |
NEBOSH International Certificate in Oil & Gas Operational Safety - IOGC |
5 days |
Health, Safety & Environment |
| 213 |
HSE84 |
NEBOSH International General Certificate - IGC |
5 days |
Health, Safety & Environment |
| 214 |
HSE85 |
NEBOSH HSE Certificate in Process Safety Management (PSM) |
5 days |
Health, Safety & Environment |
| 215 |
HSE86 |
Noise Control in Industry |
5 days |
Health, Safety & Environment |
| 216 |
HSE87 |
Occupational Safety & Health Advanced Diploma (NASP) |
5 days |
Health, Safety & Environment |
| 217 |
HSE88 |
Offshore Safety & Risk Management Systems |
5 days |
Health, Safety & Environment |
| 218 |
HSE89 |
Oil Spill Management & Beach Cleaning (OS) |
5 days |
Health, Safety & Environment |
| 219 |
HSE90 |
Oil Spill Management & Response |
5 days |
Health, Safety & Environment |
| 220 |
HSE91 |
Oil Spills and Pollution: Prevention, Response and Recovery |
5 days |
Health, Safety & Environment |
| 221 |
HSE92 |
OSHA: Occupational Safety & Health Administration Standards |
5 days |
Health, Safety & Environment |
| 222 |
HSE93 |
Permit to Work system (PTW) |
5 days |
Health, Safety & Environment |
| 223 |
HSE94 |
Pollution Prevention Techniques & Technology |
5 days |
Health, Safety & Environment |
| 224 |
HSE95 |
Prevent Disastrous Decisions |
5 days |
Health, Safety & Environment |
| 225 |
HSE96 |
Process Control & Safeguarding |
5 days |
Health, Safety & Environment |
| 226 |
HSE97 |
Process Hazard Analysis |
5 days |
Health, Safety & Environment |
| 227 |
HSE98 |
Process Safety Management - Level 1 |
5 days |
Health, Safety & Environment |
| 228 |
HSE99 |
Radiation Protection |
5 days |
Health, Safety & Environment |
| 229 |
HSE100 |
Radiation Safety |
5 days |
Health, Safety & Environment |
| 230 |
HSE101 |
Relief & Flare System |
5 days |
Health, Safety & Environment |
| 231 |
HSE102 |
Renovating Interior Underground Solvent Storage Tanks (USST) |
5 days |
Health, Safety & Environment |
| 232 |
HSE103 |
Rigger Safety |
5 days |
Health, Safety & Environment |
| 233 |
HSE104 |
Risk Assessment and HAZID Management |
5 days |
Health, Safety & Environment |
| 234 |
HSE105 |
Root Cause Analysis using Tripod Beta Method |
5 days |
Health, Safety & Environment |
| 235 |
HSE106 |
Safety Audit & Site Inspection |
5 days |
Health, Safety & Environment |
| 236 |
HSE107 |
Safety Case Development & Application |
5 days |
Health, Safety & Environment |
| 237 |
HSE108 |
Safety in Process Equipment Design & Operation |
5 days |
Health, Safety & Environment |
| 238 |
HSE109 |
Safety Management Best Practices |
5 days |
Health, Safety & Environment |
| 239 |
HSE110 |
Safety Technology & Risk Management |
5 days |
Health, Safety & Environment |
| 240 |
HSE111 |
Storage & Handling of Toxic Chemicals & Hazardous Materials |
5 days |
Health, Safety & Environment |
| 241 |
HSE112 |
Strategic Crisis Management: Incorporating Security & Major Emergency Response |
5 days |
Health, Safety & Environment |
| 242 |
HSE113 |
Sustainability, Energy & Change |
5 days |
Health, Safety & Environment |
| 243 |
HSE114 |
Sustainable Gas Supply & Demand |
5 days |
Health, Safety & Environment |
| 244 |
HSE115 |
The Complete Net Zero Emission |
5 days |
Health, Safety & Environment |
| 245 |
HSE116 |
Transition to ISO 45001: Occupational Health & Safety Management System |
5 days |
Health, Safety & Environment |
| 246 |
HSE117 |
Waste Management and Circular Economy |
5 days |
Health, Safety & Environment |
| 247 |
HSE118 |
Water Industry Fundamentals |
5 days |
Health, Safety & Environment |
| 248 |
HSE119 |
Working at Heights & falling Protection |
5 days |
Health, Safety & Environment |
| 249 |
AAW91 |
API 2201: Procedures for Welding of Hot Tapping Equipment |
5 days |
ASME, API & AMPP Protective Coating |
| 250 |
AAW92 |
API 510: Pressure Vessel Inspection Code (API Exam Preparation Training) |
5 days |
ASME, API & AMPP Protective Coating |
| 251 |
AAW93 |
API 521: Pressure Relieving and De-Pressuring Systems |
5 days |
ASME, API & AMPP Protective Coating |
| 252 |
AAW94 |
API 570: Piping Inspection Code (API Exam Preparation Training) |
5 days |
ASME, API & AMPP Protective Coating |
| 253 |
AAW95 |
API 580/581/ASME PCC-3: Risk-based Inspection Program, Technology and Planning Methods |
5 days |
ASME, API & AMPP Protective Coating |
| 254 |
AAW96 |
API 584/585: Pressure Equipment Integrity Operating Windows and Integrity Incident Investigation |
5 days |
ASME, API & AMPP Protective Coating |
| 255 |
AAW97 |
API 598: Valve Inspection & Testing |
5 days |
ASME, API & AMPP Protective Coating |
| 256 |
AAW98 |
API 620/650/651: Design, Fabrication, Erection, and Inspection of Welded and Large Low-Pressure Welded Storage Tanks and Their Cathodic Protection |
5 days |
ASME, API & AMPP Protective Coating |
| 257 |
AAW99 |
API 653: Tank Inspection, Repair Alteration and Reconstruction (API Exam Preparation Training) |
5 days |
ASME, API & AMPP Protective Coating |
| 258 |
AAW100 |
API 6D & 6FA: Specification for the Design, Manufacturing, Testing, Documentation, and Fire Test of Pipeline & Piping
Valves |
5 days |
ASME, API & AMPP Protective Coating |
| 259 |
AAW101 |
API Q1 Internal Auditor |
5 days |
ASME, API & AMPP Protective Coating |
| 260 |
AAW102 |
API Q2 Implementation and Internal Auditor Training |
5 days |
ASME, API & AMPP Protective Coating |
| 261 |
AAW103 |
API RP 571 & Advanced Damage Mechanisms and Material Investigation in the Refining, Petrochemical & Petroleum Industries |
5 days |
ASME, API & AMPP Protective Coating |
| 262 |
AAW104 |
API RP-577 Welding Process, Inspection and Metallurgy |
5 days |
ASME, API & AMPP Protective Coating |
| 263 |
AAW105 |
API Specification Q1 Practitioner (9th Edition) |
5 days |
ASME, API & AMPP Protective Coating |
| 264 |
AAW106 |
API Specification Q2 Practitioner (1st Edition) |
5 days |
ASME, API & AMPP Protective Coating |
| 265 |
AAW107 |
ASME B31.3 Process Piping Design Code |
5 days |
ASME, API & AMPP Protective Coating |
| 266 |
AAW108 |
ASME B31.4 Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids |
5 days |
ASME, API & AMPP Protective Coating |
| 267 |
AAW109 |
ASME B31.8 Gas Transmission and Distribution Piping Systems |
5 days |
ASME, API & AMPP Protective Coating |
| 268 |
AAW110 |
ASME BPV Code Section V: Nondestructive Examinations |
5 days |
ASME, API & AMPP Protective Coating |
| 269 |
AAW111 |
ASME BPV Code Section VIII Division 3: Alternative Rules for Construction of High-Pressure Vessels |
5 days |
ASME, API & AMPP Protective Coating |
| 270 |
AAW112 |
ASME BPV Code, Section VIII, Division 1 Design & Fabrication of Pressure Vessels |
5 days |
ASME, API & AMPP Protective Coating |
| 271 |
AAW113 |
ASME BPV Code, Section VIII, Division 2 Design & Fabrication of Pressure Vessels |
5 days |
ASME, API & AMPP Protective Coating |
| 272 |
AAW114 |
ASME IX Welding, Brazing and Fusing Qualifications |
5 days |
ASME, API & AMPP Protective Coating |
| 273 |
AAW115 |
Auditing Oil & Gas Industry Quality Management Systems |
5 days |
ASME, API & AMPP Protective Coating |
| 274 |
AAW116 |
Commissioning & Start-Up with API RP 1FSC Foundation |
|
ASME, API & AMPP Protective Coating |
| 275 |
AAW117 |
Fitness For Service, Remaining Life Assessment & Repair of Pressure Equipment & Piping |
|
ASME, API & AMPP Protective Coating |
| 276 |
AAW118 |
General Mechanical Codes, Standards & Specifications |
|
ASME, API & AMPP Protective Coating |
| 277 |
AAW119 |
Guidelines and Application Procedures for API - RP 578 |
|
ASME, API & AMPP Protective Coating |
| 278 |
AAW120 |
Materials & Welding Challenges for Offshore Oil & Gas Industries |
|
ASME, API & AMPP Protective Coating |
| 279 |
AAW121 |
Pipe Stress Analysis |
|
ASME, API & AMPP Protective Coating |
| 280 |
AAW122 |
Basic Coating Inspector CIP level 1 |
|
ASME, API & AMPP Protective Coating |
| 281 |
AAW123 |
Coating Inspector CIP level 2 |
|
ASME, API & AMPP Protective Coating |
| 282 |
AAW124 |
Senior Coating Inspector |
|
ASME, API & AMPP Protective Coating |
| 283 |
AAW125 |
Fundamental of Protective Coating |
|
ASME, API & AMPP Protective Coating |
| 284 |
AM120 |
Advanced Maintenance Leadership Technology |
5 days |
Assets & Maintenance |
| 285 |
AM121 |
Advanced Maintenance Planning & Scheduling |
5 days |
Assets & Maintenance |
| 286 |
AM122 |
Asset Data Management for the Oil & Gas Industry |
5 days |
Assets & Maintenance |
| 287 |
AM123 |
Asset Integrity Management for Purpose-Built FPSO’s & Subsea System Facilities |
5 days |
Assets & Maintenance |
| 288 |
AM124 |
Asset Integrity Management in Oil & Gas Industries |
5 days |
Assets & Maintenance |
| 289 |
AM125 |
Building an Effective Computerized Asset Management System - Insights, Best Practices |
5 days |
Assets & Maintenance |
| 290 |
AM126 |
Building & Facilities Maintenance |
5 days |
Assets & Maintenance |
| 291 |
AM127 |
Building Preventive Maintenance |
5 days |
Assets & Maintenance |
| 292 |
AM128 |
Certified Maintenance & Reliability Professional (CMRP) Guidance Course to Body of Knowledge - Certification Exam
Preparation |
5 days |
Assets & Maintenance |
| 293 |
AM129 |
Electrical Construction & Operational Standards in the Oil & Gas Field |
5 days |
Assets & Maintenance |
| 294 |
AM130 |
Ensuring Successful Implementation of an Asset Management System for Major Oil & Gas Projects |
5 days |
Assets & Maintenance |
| 295 |
AM131 |
Failure Mode Effect & Criticality Analysis (FMECA) Facilitator Skills |
5 days |
Assets & Maintenance |
| 296 |
AM132 |
Flow Assurance - Managing Flow Dynamics & Production Chemistry |
5 days |
Assets & Maintenance |
| 297 |
AM133 |
Fundamentals of Asset Management |
5 days |
Assets & Maintenance |
| 298 |
AM134 |
Implementing Effective Preventive & Predictive Maintenance |
5 days |
Assets & Maintenance |
| 299 |
AM135 |
Machinery Failure, Vibration & Predictive Maintenance |
5 days |
Assets & Maintenance |
| 300 |
AM136 |
Maintenance & Reliability Best Practices |
5 days |
Assets & Maintenance |
| 301 |
AM137 |
Maintenance Audit & Site Inspection |
5 days |
Assets & Maintenance |
| 302 |
AM138 |
Maintenance Contracting & Outsourcing |
5 days |
Assets & Maintenance |
| 303 |
AM139 |
Maintenance Errors |
5 days |
Assets & Maintenance |
| 304 |
AM140 |
Maintenance Excellence |
5 days |
Assets & Maintenance |
| 305 |
AM141 |
Maintenance Management. |
5 days |
Assets & Maintenance |
| 306 |
AM142 |
Maintenance Planning, Scheduling & Work Control |
5 days |
Assets & Maintenance |
| 307 |
AM143 |
Maintenance Strategy Development & Cost-Effective Implementation |
5 days |
Assets & Maintenance |
| 308 |
AM144 |
Managing Shutdowns, Turnarounds & Outages. |
5 days |
Assets & Maintenance |
| 309 |
AM145 |
Maximizing the Role of Asset Management System (AMS)/CMMS in Supporting, Managing Shutdowns & Turnarounds |
5 days |
Assets & Maintenance |
| 310 |
AM146 |
Mobile Lifting Equipment Operation & Maintenance |
5 days |
Assets & Maintenance |
| 311 |
AM147 |
Modern Maintenance Technologies |
5 days |
Assets & Maintenance |
| 312 |
AM148 |
Optimizing Equipment Maintenance & Replacement Decisions |
5 days |
Assets & Maintenance |
| 313 |
AM149 |
Optimization of Equipment Utilities/ Operations Techniques |
5 days |
Assets & Maintenance |
| 314 |
AM150 |
Planned Shutdown, Critical Activities, Isolation, Start-up & Commissioning |
5 days |
Assets & Maintenance |
| 315 |
AM151 |
Preventive & Predictive Maintenance |
5 days |
Assets & Maintenance |
| 316 |
AM152 |
Preventive Maintenance Optimization, PMO |
5 days |
Assets & Maintenance |
| 317 |
AM153 |
RCM/FMECA |
5 days |
Assets & Maintenance |
| 318 |
AM154 |
Reliability Centered Maintenance (RCM) |
5 days |
Assets & Maintenance |
| 319 |
AM155 |
Risk Based Maintenance Workshop |
5 days |
Assets & Maintenance |
| 320 |
AM156 |
Root Cause Failure Analysis (RCFA) |
5 days |
Assets & Maintenance |
| 321 |
AM157 |
Spare Parts Management. |
5 days |
Assets & Maintenance |
| 322 |
AM158 |
Successful Asset Management System Implementation Approach & Methodology |
5 days |
Assets & Maintenance |
| 323 |
AM159 |
Towards Maintenance Excellence |
5 days |
Assets & Maintenance |
| 324 |
AM160 |
Turnaround Works for Onshore & Offshore Facilities |
5 days |
Assets & Maintenance |
| 325 |
AM161 |
Asset Management Standard, ISO 55001 |
5 days |
Assets & Maintenance |
| 326 |
AM162 |
Shutdowns & Turnarounds Planning & Management \"Programmed Plant Shutdown” |
5 days |
Assets & Maintenance |
| 327 |
AM163 |
Excellence in Maintenance & Reliability Management |
5 days |
Assets & Maintenance |
| 328 |
AM164 |
Creation of Asset Management Policy & Plan According to ISO 55001 |
5 days |
Assets & Maintenance |
| 329 |
AM165 |
Proactive Reliability Maintenance & Asset Management techniques. |
5 days |
Assets & Maintenance |
| 330 |
AM166 |
Managing Maintenance resources |
5 days |
Assets & Maintenance |
| 331 |
QA170 |
Analytical and Auditing Skills |
5 days |
Quality & Audit |
| 332 |
QA171 |
Auditing Oil & Gas Industry Quality Management Systems |
5 days |
Quality & Audit |
| 333 |
QA172 |
Benchmarking for Performance Improvement in the Oil & Gas Industry |
5 days |
Quality & Audit |
| 334 |
QA173 |
Business Improvement & Quality Techniques |
5 days |
Quality & Audit |
| 335 |
QA174 |
Compliance Regulatory Professionals |
5 days |
Quality & Audit |
| 336 |
QA175 |
Construction Quality Control On-Site |
5 days |
Quality & Audit |
| 337 |
QA176 |
Fraud Detection, Tracing and Forensic Examination in the Oil and Gas Industry |
5 days |
Quality & Audit |
| 338 |
QA177 |
Fuel Quality Monitoring System Fundamentals |
5 days |
Quality & Audit |
| 339 |
QA178 |
International Maritime Dangerous Goods Training: Understanding the Purpose of the IMDG code |
5 days |
Quality & Audit |
| 340 |
QA179 |
ISO 17025 & Laboratory Information Management Systems (LIMS) for Analytical Laboratories |
5 days |
Quality & Audit |
| 341 |
QA180 |
ISO 50001: Energy Management Systems |
5 days |
Quality & Audit |
| 342 |
QA181 |
ISO/IEC 17025: 2017 General Requirements for the Competence of Testing & Calibration of Laboratories |
5 days |
Quality & Audit |
| 343 |
QA182 |
Lean Six Sigma Foundation Green Belt Programme |
5 days |
Quality & Audit |
| 344 |
QA183 |
Maintenance Audit and Site Inspection |
5 days |
Quality & Audit |
| 345 |
QA184 |
Management Systems Auditor Training |
5 days |
Quality & Audit |
| 346 |
QA185 |
Oil & Gas Industry Quality Management System Auditor/Lead Auditor Training |
5 days |
Quality & Audit |
| 347 |
QA186 |
Project Commissioning: A Practical Approach |
5 days |
Quality & Audit |
| 348 |
QA187 |
Project Quality Management Workshop |
5 days |
Quality & Audit |
| 349 |
QA188 |
QMS Audit and IFRS for Oil & Gas Industry |
5 days |
Quality & Audit |
| 350 |
QA189 |
Quality Assurance in Practice |
5 days |
Quality & Audit |
| 351 |
QA190 |
Quality Control & Quality Assurance in Concrete & Steel Structure Projects |
5 days |
Quality & Audit |
| 352 |
QA191 |
Safety Audit & Site Inspection |
5 days |
Quality & Audit |
| 353 |
QA192 |
Understanding, Developing & Maintaining Oil & Gas Industry Quality Management Systems |
5 days |
Quality & Audit |
| 354 |
QA193 |
Upstream Petroleum Contracts Accounting & Auditing Policies and Procedures |
5 days |
Quality & Audit |
| 355 |
ISO175 |
ISO 17025 & Laboratory Information Management Systems (LIMS) for Analytical Laboratories |
5 days |
ISO |
| 356 |
ISO176 |
ISO 50001: Energy Management Systems |
5 days |
ISO |
| 357 |
ISO177 |
ISO/IEC 17025: 2017 General Requirements for the Competence of Testing & Calibration of Laboratories |
5 days |
ISO |
| 358 |
ISO178 |
Management Systems Auditor Training |
5 days |
ISO |
| 359 |
ISO179 |
OSHA: Occupational Safety & Health Administration Standards |
5 days |
ISO |
| 360 |
ISO180 |
Transition to ISO 45001: Occupational Health & Safety Management System |
5 days |
ISO |
| 361 |
ISO181 |
Understanding, Developing & Maintaining Oil & Gas Industry Quality Management Systems |
5 days |
ISO |
| 362 |
PPE185 |
Fundamentals of Offshore Pipeline Engineering |
5 days |
Pipeline Engineering |
| 363 |
PPE186 |
Hot Tapping & Plugging in Petroleum Industries |
5 days |
Pipeline Engineering |
| 364 |
PPE187 |
Integrity Management of Onshore & Offshore Pipelines |
5 days |
Pipeline Engineering |
| 365 |
PPE188 |
Intelligent Pigging & Mechanical Cleaning of Offshore & Onshore Pipelines |
5 days |
Pipeline Engineering |
| 366 |
PPE189 |
Onshore Pipeline Facilities - Design, Construction & Operations |
5 days |
Pipeline Engineering |
| 367 |
PPE190 |
Pipeline Inspection using Intelligent Pigging |
5 days |
Pipeline Engineering |
| 368 |
PRC195 |
Aromatics Processes, Technology & Markets |
5 days |
Process Engineering |
| 369 |
PRC196 |
Automated Gauging & Metering for Oil Stockpiles |
5 days |
Process Engineering |
| 370 |
PRC197 |
Crude Oil Treatments |
5 days |
Process Engineering |
| 371 |
PRC198 |
Process Burner Fundamentals |
5 days |
Process Engineering |
| 372 |
PRC199 |
Process Control Cyber - Security |
5 days |
Process Engineering |
| 373 |
PRC200 |
Process Engineering Essentials |
5 days |
Process Engineering |
| 374 |
PRC201 |
Process Flare Fundamentals |
5 days |
Process Engineering |
| 375 |
PRC202 |
Process Plant Optimization & Energy Conservation |
5 days |
Process Engineering |
| 376 |
PRC203 |
Process Plant Optimization Technology & Continual Improvement |
5 days |
Process Engineering |
| 377 |
PRC204 |
Process Plant Troubleshooting & Engineering Problem Solving |
5 days |
Process Engineering |
| 378 |
PRC205 |
Safety in Process Equipment Design & Operation |
5 days |
Process Engineering |
| 379 |
PRC206 |
Understanding & Preventing Process Equipment Failures |
5 days |
Process Engineering |
| 380 |
LF210 |
Lifting supervisor |
5 days |
Lifting & Forklift |
| 381 |
LF211 |
Dogging & Rigging |
5 days |
Lifting & Forklift |
| 382 |
LF212 |
Certified Lifting planner |
5 days |
Lifting & Forklift |
| 383 |
LF213 |
Man-Lift Safety & Operation |
5 days |
Lifting & Forklift |
| 384 |
LF214 |
Manual Handling |
5 days |
Lifting & Forklift |
| 385 |
LF215 |
PTW, LOTO, Isolation |
5 days |
Lifting & Forklift |
| 386 |
LF216 |
Scaffolding Erecting & Inspection |
5 days |
Lifting & Forklift |
| 387 |
LF217 |
Lifting awareness |
5 days |
Lifting & Forklift |
| 388 |
LF218 |
Rigger & Banks Man Level 1, 2, 3 |
5 days |
Lifting & Forklift |
| 389 |
LF219 |
Forklift Operator |
5 days |
Lifting & Forklift |
| 390 |
LF220 |
Mobile Crane Operator |
5 days |
Lifting & Forklift |
| 391 |
LF221 |
Offshore Crane Operator |
5 days |
Lifting & Forklift |
| 392 |
LF222 |
Overhead Crane Operator |
5 days |
Lifting & Forklift |
| 393 |
LF223 |
Lifting Accessory Examiner Overseas |
5 days |
Lifting & Forklift |
| 394 |
LF224 |
Lifting Equipment Inspection |
5 days |
Lifting & Forklift |
| 395 |
LF225 |
Mobile Elevating Work Platforms (Man lift Operator) |
5 days |
Lifting & Forklift |
| 396 |
LF226 |
Lifting Operations Appointed Person |
5 days |
Lifting & Forklift |
| 397 |
LF227 |
LEEA Advanced |
5 days |
Lifting & Forklift |
| 398 |
LF228 |
OPITO Rigger Stages 1&2 |
5 days |
Lifting & Forklift |
| 399 |
LF229 |
LEEA Foundation |
5 days |
Lifting & Forklift |
| 400 |
LF230 |
Plunger Lift |
5 days |
Lifting & Forklift |
| 401 |
PCP235 |
Clean Fuel Technology & Standards |
5 days |
Petrochemical, Chemical & Petroleum Refining |
| 402 |
PCP236 |
Crude Oil & Refined Products Sales, Marketing, Trading & Risk Management |
5 days |
Petrochemical, Chemical & Petroleum Refining |
| 403 |
PCP237 |
Designing of Blast Resistant Buildings for Oil, Gas & Petrochemical Plants |
5 days |
Petrochemical, Chemical & Petroleum Refining |
| 404 |
PCP238 |
Developing Clean Energy & Hydrogen Economy from Sustainable Ammonia Production |
5 days |
Petrochemical, Chemical & Petroleum Refining |
| 405 |
PCP239 |
Distillation Columns Technology |
5 days |
Petrochemical, Chemical & Petroleum Refining |
| 406 |
PCP240 |
Dynamics of Petroleum Depot Operations |
5 days |
Petrochemical, Chemical & Petroleum Refining |
| 407 |
PCP241 |
Energy Optimization of Oil Refineries |
5 days |
Petrochemical, Chemical & Petroleum Refining |
| 408 |
PCP242 |
Engineering Resins: From Feedstocks to the Marketplace |
5 days |
Petrochemical, Chemical & Petroleum Refining |
| 409 |
PCP243 |
Fluid Catalytic Cracking in Petroleum Refineries |
5 days |
Petrochemical, Chemical & Petroleum Refining |
| 410 |
PCP244 |
Forecasting the Prices of Crude-Oil, Natural-Gas & Refined Products |
5 days |
Petrochemical, Chemical & Petroleum Refining |
| 411 |
PCP245 |
Gas Chromatography & Troubleshooting for the Oil & Gas Industry |
5 days |
Petrochemical, Chemical & Petroleum Refining |
| 412 |
PCP246 |
Gasoline Blending in Refineries |
5 days |
Petrochemical, Chemical & Petroleum Refining |
| 413 |
PCP247 |
Hydrocarbon Loss Reduction |
5 days |
Petrochemical, Chemical & Petroleum Refining |
| 414 |
PCP248 |
Hydrocarbon Production Operations |
5 days |
Petrochemical, Chemical & Petroleum Refining |
| 415 |
PCP249 |
Hydrogen: Production, Delivery, Storage & Use |
5 days |
Petrochemical, Chemical & Petroleum Refining |
| 416 |
PCP250 |
Hydro-Treating & Hydrocracking Process Technology |
5 days |
Petrochemical, Chemical & Petroleum Refining |
| 417 |
PCP251 |
Oil Refinery & Petrochemical Industry Wastewater Treatment |
5 days |
Petrochemical, Chemical & Petroleum Refining |
| 418 |
PCP252 |
Production Planning & Scheduling in Petroleum Refineries |
5 days |
Petrochemical, Chemical & Petroleum Refining |
| 419 |
PCP253 |
Refinery Process Yield Optimization |
5 days |
Petrochemical, Chemical & Petroleum Refining |
| 420 |
PCP254 |
Refinery Shutdown & Turnaround |
5 days |
Petrochemical, Chemical & Petroleum Refining |
| 421 |
PCP255 |
Supervisory Excellence in the Oil, Gas & Petrochemicals Industry |
5 days |
Petrochemical, Chemical & Petroleum Refining |
| 422 |
PCP256 |
The Chemical & Petrochemicals Industry for Non-Technical Personnel |
5 days |
Petrochemical, Chemical & Petroleum Refining |
| 423 |
OMT260 |
Advanced Fabrication & Construction of Fixed Offshore Structures |
5 days |
Offshore & Marine Technology |
| 424 |
OMT261 |
Advanced Heavy Lifting & Transportation Techniques for Onshore & Offshore Projects |
5 days |
Offshore & Marine Technology |
| 425 |
OMT262 |
Crude Oil Tanker Cargo Operations Best Practices |
5 days |
Offshore & Marine Technology |
| 426 |
OMT263 |
Dynamic Positioning (DP) Familiarization for Maritime & Offshore Oil & Gas Professionals |
5 days |
Offshore & Marine Technology |
| 427 |
OMT264 |
FLNG Operation & Maintenance (Floating Liquefied Natural Gas) |
5 days |
Offshore & Marine Technology |
| 428 |
OMT265 |
Flow Assurance for Offshore Production |
5 days |
Offshore & Marine Technology |
| 429 |
OMT266 |
FPSO Design & Technology |
5 days |
Offshore & Marine Technology |
| 430 |
OMT267 |
FPSO Operation & Maintenance (Floating Production Storage & Offloading) |
5 days |
Offshore & Marine Technology |
| 431 |
OMT268 |
Fundamentals of Deepwater Riser Engineering |
5 days |
Offshore & Marine Technology |
| 432 |
OMT269 |
Fundamentals of Offshore Systems Design & Construction |
5 days |
Offshore & Marine Technology |
| 433 |
OMT270 |
International Maritime Dangerous Goods: Understanding the Purpose of IMDG code |
5 days |
Offshore & Marine Technology |
| 434 |
OMT271 |
International Safety Management (ISM) Code Familiarization for Maritime & Offshore Oil & Gas Professionals |
5 days |
Offshore & Marine Technology |
| 435 |
OMT272 |
Loading Master for Oil, LNG, Gas & Petrochemical Terminals |
5 days |
Offshore & Marine Technology |
| 436 |
OMT273 |
Managing Offshore Field Development & Marine Asset |
5 days |
Offshore & Marine Technology |
| 437 |
OMT274 |
Managing Tanker Cargo Operations |
5 days |
Offshore & Marine Technology |
| 438 |
OMT275 |
Managing the Bunkering & Use of LNG Fuel on Ships |
5 days |
Offshore & Marine Technology |
| 439 |
OMT276 |
Marine Engineering for Non-Technical Professionals |
5 days |
Offshore & Marine Technology |
| 440 |
OMT277 |
Marine Environment Protection |
5 days |
Offshore & Marine Technology |
| 441 |
OMT278 |
Maritime Energy Management |
5 days |
Offshore & Marine Technology |
| 442 |
OMT279 |
Maritime Security Management & Control as per ISPS Code |
5 days |
Offshore & Marine Technology |
| 443 |
OMT280 |
Offshore & Marine Projects Risks Management |
5 days |
Offshore & Marine Technology |
| 444 |
OMT281 |
Offshore Oil & Gas Development Projects, Concepts & Facilities |
5 days |
Offshore & Marine Technology |
| 445 |
OMT282 |
Offshore Safety & Risk Management Systems |
5 days |
Offshore & Marine Technology |
| 446 |
OMT283 |
Offshore Structure Design, Construction & Maintenance |
5 days |
Offshore & Marine Technology |
| 447 |
OMT284 |
Oil & Gas Marine Terminals |
5 days |
Offshore & Marine Technology |
| 448 |
OMT285 |
Risk-Based Inspection (RBI) Planning of Offshore & Marine Facilities |
5 days |
Offshore & Marine Technology |
| 449 |
OMT286 |
Shipping Management, Leadership & Strategy |
5 days |
Offshore & Marine Technology |
| 450 |
OMT287 |
Subsea & Marine Design, Operation & Maintenance |
5 days |
Offshore & Marine Technology |
| 451 |
OMT288 |
Subsea Control & Communication Systems |
5 days |
Offshore & Marine Technology |
| 452 |
OMT289 |
Subsea Equipment & Technology for Oil & Gas Production |
5 days |
Offshore & Marine Technology |
| 453 |
OMT290 |
Subsea Systems, Processes & Topside Interface for Oil & Gas Production |
5 days |
Offshore & Marine Technology |
| 454 |
OMT291 |
Topside / Jacket Fabrication Works in Major Shipyards |
5 days |
Offshore & Marine Technology |
| 455 |
OMT292 |
Topside Processing Systems |
5 days |
Offshore & Marine Technology |
| 456 |
ME300 |
Advance Mechanical Maintenance |
5 days |
Mechanical Engineering |
| 457 |
ME301 |
Advanced Centrifugal Pump Operation & Troubleshooting. |
5 days |
Mechanical Engineering |
| 458 |
ME302 |
Advanced Pipeline Operation & Maintenance |
5 days |
Mechanical Engineering |
| 459 |
ME303 |
Advanced Process Troubleshooting & Control Systems |
5 days |
Mechanical Engineering |
| 460 |
ME304 |
Advanced Production Management |
5 days |
Mechanical Engineering |
| 461 |
ME305 |
Air Compressors Maintenance Inspection & Overhaul |
5 days |
Mechanical Engineering |
| 462 |
ME306 |
Air Conditioners & Troubleshooting |
5 days |
Mechanical Engineering |
| 463 |
ME307 |
Analysis of Finite Difference Elements |
5 days |
Mechanical Engineering |
| 464 |
ME308 |
ANSYS Mechanical for Pressure Vessel Applications |
5 days |
Mechanical Engineering |
| 465 |
ME309 |
Application to a Refinery Worksheet |
5 days |
Mechanical Engineering |
| 466 |
ME310 |
Aspects of Operation & Maintenance for Heavy Diesel Duty |
5 days |
Mechanical Engineering |
| 467 |
ME311 |
Balancing of Flexible Rotors |
5 days |
Mechanical Engineering |
| 468 |
ME312 |
Basics of Boosting Pumping Stations & Control |
5 days |
Mechanical Engineering |
| 469 |
ME313 |
Basics of Rotating Mechanical Equipment |
5 days |
Mechanical Engineering |
| 470 |
ME314 |
Basics of Static Mechanical Equipment |
5 days |
Mechanical Engineering |
| 471 |
ME315 |
Boiler Feed Pump Operation & Maintenance. |
5 days |
Mechanical Engineering |
| 472 |
ME316 |
Boiler Horsepower Calculations |
5 days |
Mechanical Engineering |
| 473 |
ME317 |
Boiler Operation, Maintenance & Inspection |
5 days |
Mechanical Engineering |
| 474 |
ME318 |
Centrifugal Compressors & Steam Turbines |
5 days |
Mechanical Engineering |
| 475 |
ME319 |
Coiled Tubing Technology |
5 days |
Mechanical Engineering |
| 476 |
ME320 |
Combustion & Heat Transfer for Refinery Operations |
5 days |
Mechanical Engineering |
| 477 |
ME321 |
Commissioning & Start-Up with API RP 1FSC Foundation |
5 days |
Mechanical Engineering |
| 478 |
ME322 |
Common Problems of Hydraulic Systems & Solutions |
5 days |
Mechanical Engineering |
| 479 |
ME323 |
Compressor Systems - Mechanical Design & Specification |
5 days |
Mechanical Engineering |
| 480 |
ME324 |
Compressors Operation & Troubleshooting |
5 days |
Mechanical Engineering |
| 481 |
ME325 |
Control System Operation Daily Production Report & Confined Space Entry |
5 days |
Mechanical Engineering |
| 482 |
ME326 |
Cooling Towers - Selection, Operation & Troubleshooting |
5 days |
Mechanical Engineering |
| 483 |
ME327 |
Couplings & Shaft Alignment |
5 days |
Mechanical Engineering |
| 484 |
ME328 |
CRU operations |
5 days |
Mechanical Engineering |
| 485 |
ME329 |
Crude & Vacuum Process Technology |
5 days |
Mechanical Engineering |
| 486 |
ME330 |
Design of Water System Distribution for Buildings & Remote Destinations |
5 days |
Mechanical Engineering |
| 487 |
ME331 |
Design, Operation & Troubleshooting of Electric Submersible Pump |
5 days |
Mechanical Engineering |
| 488 |
ME332 |
Effect of Pump Cavitation on Stability of Shaft Alignment |
5 days |
Mechanical Engineering |
| 489 |
ME333 |
Effect of Reservoir Parameters on Selection Oil Treatment Facilities |
5 days |
Mechanical Engineering |
| 490 |
ME334 |
Electric Submersible Pumps |
5 days |
Mechanical Engineering |
| 491 |
ME335 |
Emergency & Process Shutdown |
5 days |
Mechanical Engineering |
| 492 |
ME336 |
Emergency Shutdown (ESD) |
5 days |
Mechanical Engineering |
| 493 |
ME337 |
Energy Isolation |
5 days |
Mechanical Engineering |
| 494 |
ME338 |
Engineering Codes & Standards for Water Pumping |
5 days |
Mechanical Engineering |
| 495 |
ME339 |
Enhancing Efficiency & Reliability in Refinery Process Heaters |
5 days |
Mechanical Engineering |
| 496 |
ME340 |
Factors Affecting Stability of High-Speed Rotating Machinery |
5 days |
Mechanical Engineering |
| 497 |
ME341 |
Flow Measurement & Custody Transfer |
5 days |
Mechanical Engineering |
| 498 |
ME342 |
Flue Gas Treatment plant, Electrostatic Precipitator & Fly Ash Conveying System Operation |
5 days |
Mechanical Engineering |
| 499 |
ME343 |
Fluid Mechanics & its applications |
5 days |
Mechanical Engineering |
| 500 |
ME344 |
Fluid Properties & Phase Behavior (PVT) |
5 days |
Mechanical Engineering |
| 501 |
ME345 |
FPSO / FLNG E&I Design Installation & Operation |
5 days |
Mechanical Engineering |
| 502 |
ME346 |
Fundamentals of Pump & Compressor Systems |
5 days |
Mechanical Engineering |
| 503 |
ME347 |
General Mechanical Codes, Standards & Specifications |
5 days |
Mechanical Engineering |
| 504 |
ME348 |
Handling Bulk Material, Loading Operations for Sulphur Plan |
5 days |
Mechanical Engineering |
| 505 |
ME349 |
Heat & Mass Transfer |
5 days |
Mechanical Engineering |
| 506 |
ME350 |
Heat Exchangers: Types, Application, Design, Operation & Maintenance |
5 days |
Mechanical Engineering |
| 507 |
ME351 |
Heat Medium Fired Heater Troubleshooting & Maintenance |
5 days |
Mechanical Engineering |
| 508 |
ME352 |
Heat Transfer & Exchangers |
5 days |
Mechanical Engineering |
| 509 |
ME353 |
Heavy Duty Diesel Engine (HDD) Operation & Maintenance |
5 days |
Mechanical Engineering |
| 510 |
ME354 |
Hydraulic & Pneumatic Systems |
5 days |
Mechanical Engineering |
| 511 |
ME355 |
Hydro processing for Clean Energy: Design, Operation & Optimization |
5 days |
Mechanical Engineering |
| 512 |
ME356 |
Hydro-Treating & Hydrocracker Technology |
5 days |
Mechanical Engineering |
| 513 |
ME357 |
Incident & Accident Investigation |
5 days |
Mechanical Engineering |
| 514 |
ME358 |
Inspect all the Plant Equipment & Pipe Work Within Gas Plant |
5 days |
Mechanical Engineering |
| 515 |
ME359 |
Installation, Operation & Maintenance for Energy Meters |
5 days |
Mechanical Engineering |
| 516 |
ME360 |
Instrumentation & Modern Control Systems |
5 days |
Mechanical Engineering |
| 517 |
ME361 |
Integrated Operations in Oil Production, Transportation, Refining & Marketing |
5 days |
Mechanical Engineering |
| 518 |
ME362 |
Liaise with Operators to Confirm Good Data of Control Systems |
5 days |
Mechanical Engineering |
| 519 |
ME363 |
Losses in Water Fittings |
5 days |
Mechanical Engineering |
| 520 |
ME364 |
Machinery Failure Analysis & Prevention |
5 days |
Mechanical Engineering |
| 521 |
ME365 |
Machinery Root Cause Failure Analysis |
5 days |
Mechanical Engineering |
| 522 |
ME366 |
Maintenance of Static & Rotating Equipment |
5 days |
Mechanical Engineering |
| 523 |
ME367 |
Maintenance Planning & Scheduling |
5 days |
Mechanical Engineering |
| 524 |
ME368 |
Managing, Planning & Control of Gas Processing Unit |
5 days |
Mechanical Engineering |
| 525 |
ME369 |
Manual Valves Advanced |
5 days |
Mechanical Engineering |
| 526 |
ME370 |
Materials & Substances for water pumping |
5 days |
Mechanical Engineering |
| 527 |
ME371 |
Materials in Oil & Gas & its usage & applications |
5 days |
Mechanical Engineering |
| 528 |
ME372 |
Measuring & Metering in Oil & Gas Industry |
5 days |
Mechanical Engineering |
| 529 |
ME373 |
Mechanical Maintenance in Industrial Plants |
5 days |
Mechanical Engineering |
| 530 |
ME374 |
Mechanical Processing & Instrumentation for Water Pumping Systems |
5 days |
Mechanical Engineering |
| 531 |
ME375 |
Mechanical Seals Selection, Maintenance & Troubleshooting |
5 days |
Mechanical Engineering |
| 532 |
ME376 |
Mechanical Specification of Pressure Vessels & Heat Exchangers |
5 days |
Mechanical Engineering |
| 533 |
ME377 |
MOL Pumps Maintenance & Overhauling |
5 days |
Mechanical Engineering |
| 534 |
ME378 |
Motor Control Centers & Variable Frequency Drives |
5 days |
Mechanical Engineering |
| 535 |
ME379 |
Oil & Gas Testing & Sampling |
5 days |
Mechanical Engineering |
| 536 |
ME380 |
Oil & Gas Processing Flow Measurement |
5 days |
Mechanical Engineering |
| 537 |
ME381 |
Operational Excellence |
5 days |
Mechanical Engineering |
| 538 |
ME382 |
Operational Process & Utility |
5 days |
Mechanical Engineering |
| 539 |
ME383 |
Operational Troubleshooting & Analyzing Production Reports |
5 days |
Mechanical Engineering |
| 540 |
ME384 |
Operations for Gathering Centers |
5 days |
Mechanical Engineering |
| 541 |
ME385 |
Optimized Power Generated by Steam Turbines |
5 days |
Mechanical Engineering |
| 542 |
ME386 |
Over-pressure Systems; Selection & Sizing |
5 days |
Mechanical Engineering |
| 543 |
ME387 |
Performance Analysis, Prediction, & Optimization Using Nodal Analysis |
5 days |
Mechanical Engineering |
| 544 |
ME388 |
Piping Systems - Mechanical Design & Specification |
5 days |
Mechanical Engineering |
| 545 |
ME389 |
Practice on Balancing of Rotating Machinery |
5 days |
Mechanical Engineering |
| 546 |
ME390 |
Pressure Relief Devices & Safety Valves Maintenance & Repair |
5 days |
Mechanical Engineering |
| 547 |
ME391 |
Prevention of Water Back Flow |
5 days |
Mechanical Engineering |
| 548 |
ME392 |
Principles of Failures |
5 days |
Mechanical Engineering |
| 549 |
ME393 |
Pumps & Pumping Systems Optimization |
5 days |
Mechanical Engineering |
| 550 |
ME394 |
Pumps Installation Troubleshooting & Maintenance |
5 days |
Mechanical Engineering |
| 551 |
ME395 |
Pumps Operations & Maintenance |
5 days |
Mechanical Engineering |
| 552 |
ME396 |
Pumps, Compressors & Turbines |
5 days |
Mechanical Engineering |
| 553 |
ME397 |
Rationalization Tools & Work Equipment |
5 days |
Mechanical Engineering |
| 554 |
ME398 |
Regulations & standards for water fittings |
5 days |
Mechanical Engineering |
| 555 |
ME399 |
Requirements for Hot & Cold-Water Services |
5 days |
Mechanical Engineering |
| 556 |
ME400 |
Reverse Engineering in Manufacturing Mechanical Spare Parts |
5 days |
Mechanical Engineering |
| 557 |
ME401 |
Rotating Equipment Function Overview |
5 days |
Mechanical Engineering |
| 558 |
ME402 |
Rotor Bearing Systems |
5 days |
Mechanical Engineering |
| 559 |
ME403 |
Rotor Dynamic Characteristics |
5 days |
Mechanical Engineering |
| 560 |
ME404 |
Selection & Sizing Relief / Flare System |
5 days |
Mechanical Engineering |
| 561 |
ME405 |
Service & Maintenance of Oil Processing Facilities |
5 days |
Mechanical Engineering |
| 562 |
ME406 |
Shaft Alignment |
5 days |
Mechanical Engineering |
| 563 |
ME407 |
Solving Compressor Surging Problems |
5 days |
Mechanical Engineering |
| 564 |
ME408 |
Solving Flow Problems |
5 days |
Mechanical Engineering |
| 565 |
ME409 |
Solving Production Problems |
5 days |
Mechanical Engineering |
| 566 |
ME410 |
Stability of High Rotating Machinery |
5 days |
Mechanical Engineering |
| 567 |
ME411 |
Start-up & Shutdown Oil & Gas Plants |
5 days |
Mechanical Engineering |
| 568 |
ME412 |
Starting Procedures & Control Operating Parameters of Diesel Generator |
5 days |
Mechanical Engineering |
| 569 |
ME413 |
Steam Turbines & Centrifugal Compressors: Operations, Maintenance & Troubleshooting |
5 days |
Mechanical Engineering |
| 570 |
ME414 |
Surface Production Facilities & Operations |
5 days |
Mechanical Engineering |
| 571 |
ME415 |
The Complete Tribology Course: Friction, Wear & Lubrication |
5 days |
Mechanical Engineering |
| 572 |
ME416 |
Troubleshooting of Water Pumping Process |
5 days |
Mechanical Engineering |
| 573 |
ME417 |
Troubleshooting, Maintenance & Operation for Steam Turbines & Centrifugal Pumps |
5 days |
Mechanical Engineering |
| 574 |
ME418 |
Turbo-machinery Monitoring |
5 days |
Mechanical Engineering |
| 575 |
ME419 |
Valve Operations & Troubleshooting |
5 days |
Mechanical Engineering |
| 576 |
ME420 |
Valve Selection, Maintenance & Repair |
5 days |
Mechanical Engineering |
| 577 |
ME421 |
Valve Technology: Selection, Installation, Upgrading, Inspection & Troubleshooting |
5 days |
Mechanical Engineering |
| 578 |
ME422 |
Valves & Actuators Technology |
5 days |
Mechanical Engineering |
| 579 |
ME423 |
Variable Speed Motor Drives |
5 days |
Mechanical Engineering |
| 580 |
ME424 |
Vibration Analysis & Condition Monitoring |
5 days |
Mechanical Engineering |
| 581 |
ME425 |
Vibration Analysis & Rotating Equipment |
5 days |
Mechanical Engineering |
| 582 |
ME426 |
Vibration Analysis: Implementing Latest Standard Systems & Procedures |
5 days |
Mechanical Engineering |
| 583 |
ME427 |
Vibration Monitoring, Analysis & Balancing |
5 days |
Mechanical Engineering |
| 584 |
ME428 |
Water Flooding - Reservoir Souring & Eater Breakthrough |
5 days |
Mechanical Engineering |
| 585 |
ME429 |
Water Handling Operations Management |
5 days |
Mechanical Engineering |
| 586 |
ME430 |
Water Networks Design Procedures |
5 days |
Mechanical Engineering |
| 587 |
ME431 |
Water Plants Flushing, Testing & Sterilization |
5 days |
Mechanical Engineering |
| 588 |
ME432 |
Water Pumping Process |
5 days |
Mechanical Engineering |
| 589 |
ME433 |
Water Pumps Mechanical Design Engineering |
5 days |
Mechanical Engineering |
| 590 |
ME434 |
Water Pumps Sizing & Selection |
5 days |
Mechanical Engineering |
| 591 |
ME435 |
Water System Design & Installation |
5 days |
Mechanical Engineering |
| 592 |
ME436 |
Water Treatment & Analysis |
5 days |
Mechanical Engineering |
| 593 |
ME437 |
Work-pack Engineering for Refurbishment / Debottlenecking Works for both Onshore & Offshore Facility |
5 days |
Mechanical Engineering |
| 594 |
PCT445 |
Acidizing Applications in Sandstones & Carbonates |
5 days |
Production, Completions Engineering & Technology |
| 595 |
PCT446 |
Advanced Hydraulic Fracturing |
5 days |
Production, Completions Engineering & Technology |
| 596 |
PCT447 |
Applied Water Technology in Oil & Gas Production |
5 days |
Production, Completions Engineering & Technology |
| 597 |
PCT448 |
Beam Pumps |
5 days |
Production, Completions Engineering & Technology |
| 598 |
PCT449 |
Best Practices in Surface Production Operations Management |
5 days |
Production, Completions Engineering & Technology |
| 599 |
PCT450 |
Coiled Tubing Interventions |
5 days |
Production, Completions Engineering & Technology |
| 600 |
PCT451 |
Completions & Workovers |
5 days |
Production, Completions Engineering & Technology |
| 601 |
PCT452 |
Downhole Remediation Practices for Mature Oil & Gas Wells |
5 days |
Production, Completions Engineering & Technology |
| 602 |
PCT453 |
Flow Assurance for Offshore Production |
5 days |
Production, Completions Engineering & Technology |
| 603 |
PCT454 |
Formation Damage: Causes, Prevention & Remediation |
5 days |
Production, Completions Engineering & Technology |
| 604 |
PCT455 |
Gas Lift Design, Operation & Troubleshooting |
5 days |
Production, Completions Engineering & Technology |
| 605 |
PCT456 |
Gas Production Engineering |
5 days |
Production, Completions Engineering & Technology |
| 606 |
PCT457 |
Horizontal & Multilateral Wells: Completions & Stimulation |
5 days |
Production, Completions Engineering & Technology |
| 607 |
PCT458 |
Hydraulic Fracturing Applications |
5 days |
Production, Completions Engineering & Technology |
| 608 |
PCT459 |
NODAL Analysis Workshop |
5 days |
Production, Completions Engineering & Technology |
| 609 |
PCT460 |
Oil & Gas Exploration & Production |
5 days |
Production, Completions Engineering & Technology |
| 610 |
PCT461 |
Oil & Gas Field Operations & Commingled Productions Allocations |
5 days |
Production, Completions Engineering & Technology |
| 611 |
PCT462 |
Optimization of Oil & Gas Facilities Design & Operations |
5 days |
Production, Completions Engineering & Technology |
| 612 |
PCT463 |
Performance Analysis, Prediction & Optimization Using Nodal Analysis |
5 days |
Production, Completions Engineering & Technology |
| 613 |
PCT464 |
Production / Completions Engineering Progression Matrix |
5 days |
Production, Completions Engineering & Technology |
| 614 |
PCT465 |
Production Chemistry |
5 days |
Production, Completions Engineering & Technology |
| 615 |
PCT466 |
Production Logging |
5 days |
Production, Completions Engineering & Technology |
| 616 |
PCT467 |
Production Operations |
5 days |
Production, Completions Engineering & Technology |
| 617 |
PCT468 |
Production Technology for Other Disciplines |
5 days |
Production, Completions Engineering & Technology |
| 618 |
PCT469 |
Sand Control |
5 days |
Production, Completions Engineering & Technology |
| 619 |
PCT470 |
Scale Identification, Remediation & Prevention Workshop |
5 days |
Production, Completions Engineering & Technology |
| 620 |
PCT471 |
Subsurface Production Operations & Artificial Lift Technologies |
5 days |
Production, Completions Engineering & Technology |
| 621 |
PCT472 |
Surface Production Operations |
5 days |
Production, Completions Engineering & Technology |
| 622 |
PCT473 |
Unconventional Resources Completion & Stimulation |
5 days |
Production, Completions Engineering & Technology |
| 623 |
PCT474 |
Upstream Production for Oil & Gas |
5 days |
Production, Completions Engineering & Technology |
| 624 |
PCT475 |
Water Management in Heavy Oil Resource Operations |
5 days |
Production, Completions Engineering & Technology |
| 625 |
PCT476 |
Well Stimulation: Practical & Applied |
5 days |
Production, Completions Engineering & Technology |
| 626 |
PCT477 |
Wireline Operations & Techniques |
5 days |
Production, Completions Engineering & Technology |
| 749 |
ICE485 |
AC Motors & Drives |
5 days |
Instrumentation, Controls & Electrical |
| 750 |
ICE486 |
A Complete Guide to Instrumentation for Non-Instrumentation People |
5 days |
Instrumentation, Controls & Electrical |
| 751 |
ICE487 |
AC/DC Motors Drives & Control |
5 days |
Instrumentation, Controls & Electrical |
| 752 |
ICE488 |
ACI Code Requirements & Specifications for Concrete Design, Construction & Repair |
5 days |
Instrumentation, Controls & Electrical |
| 753 |
ICE489 |
Advanced Circuit Breakers Operation & Maintenance |
5 days |
Instrumentation, Controls & Electrical |
| 754 |
ICE490 |
Advanced Electric Motors: Operation, Maintenance & Troubleshooting |
5 days |
Instrumentation, Controls & Electrical |
| 755 |
ICE491 |
Advanced Electrical Safety |
5 days |
Instrumentation, Controls & Electrical |
| 756 |
ICE492 |
Advanced Generator Maintenance |
5 days |
Instrumentation, Controls & Electrical |
| 757 |
ICE493 |
Advanced Power Transmission Technologies |
5 days |
Instrumentation, Controls & Electrical |
| 758 |
ICE494 |
Advanced Process Control |
5 days |
Instrumentation, Controls & Electrical |
| 759 |
ICE495 |
Automatic Voltage Regulators (AVR) |
5 days |
Instrumentation, Controls & Electrical |
| 760 |
ICE496 |
Basic Electrical & Instrumentation Design |
5 days |
Instrumentation, Controls & Electrical |
| 761 |
ICE497 |
Basic Process Control |
5 days |
Instrumentation, Controls & Electrical |
| 762 |
ICE498 |
Basics of Instrumentation & Control |
5 days |
Instrumentation, Controls & Electrical |
| 763 |
ICE499 |
Circuit Breakers & Switchgears (Inspection, Maintenance, Design, Repair & Troubleshooting) |
5 days |
Instrumentation, Controls & Electrical |
| 764 |
ICE500 |
Commissioning of Electrical Equipment & Control System |
5 days |
Instrumentation, Controls & Electrical |
| 765 |
ICE501 |
Commissioning, Inspecting, Testing & Maintenance for LV, MV & HV Electric Power |
5 days |
Instrumentation, Controls & Electrical |
| 766 |
ICE502 |
Compressor Control & Protection |
5 days |
Instrumentation, Controls & Electrical |
| 767 |
ICE503 |
Condition Monitoring of Power System Equipment |
5 days |
Instrumentation, Controls & Electrical |
| 768 |
ICE504 |
Configuring & Testing Smart Field Devices |
5 days |
Instrumentation, Controls & Electrical |
| 769 |
ICE505 |
Control Valves & Actuators (Design, Operation & Maintenance) |
5 days |
Instrumentation, Controls & Electrical |
| 770 |
ICE506 |
Couplings & Shaft Alignment |
5 days |
Instrumentation, Controls & Electrical |
| 771 |
ICE507 |
Design of Modern Electrical Distribution Systems |
5 days |
Instrumentation, Controls & Electrical |
| 772 |
ICE508 |
Distributed Control System (DCS) |
5 days |
Instrumentation, Controls & Electrical |
| 773 |
ICE509 |
Distribution Network Design & Planning |
5 days |
Instrumentation, Controls & Electrical |
| 774 |
ICE510 |
Distribution system operation & maintenance |
5 days |
Instrumentation, Controls & Electrical |
| 775 |
ICE511 |
Earthing Bonding, Lightning & Surge Protection of Electrical Systems & Equipment |
5 days |
Instrumentation, Controls & Electrical |
| 776 |
ICE512 |
Earthing System |
5 days |
Instrumentation, Controls & Electrical |
| 777 |
ICE514 |
Electric Motors Maintenance & Testing |
5 days |
Instrumentation, Controls & Electrical |
| 778 |
ICE515 |
Electric Power Substation: Maintenance, Grounding & Safety |
5 days |
Instrumentation, Controls & Electrical |
| 779 |
ICE516 |
Electric Power System Basics for non-Electrical Professional |
5 days |
Instrumentation, Controls & Electrical |
| 780 |
ICE517 |
Electrical Demand Side Management (DSM) |
5 days |
Instrumentation, Controls & Electrical |
| 781 |
ICE518 |
Electrical Drawing Reading & Interpreting |
5 days |
Instrumentation, Controls & Electrical |
| 782 |
ICE519 |
Electrical Drawings & Control Circuits |
5 days |
Instrumentation, Controls & Electrical |
| 783 |
ICE520 |
Electrical Engineering Fundamentals for Facilities Engineers |
5 days |
Instrumentation, Controls & Electrical |
| 784 |
ICE522 |
Electrical Equipment Installation Control System Commissioning: Testing Start-Up of Electrical System |
5 days |
Instrumentation, Controls & Electrical |
| 785 |
ICE523 |
Electrical Equipment: Transformers, Inverters, Rectifiers, Uninterruptable Power Systems, Generators |
5 days |
Instrumentation, Controls & Electrical |
| 786 |
ICE524 |
Electrical Faults, Causes, Analysis, Detection & Remedies |
5 days |
Instrumentation, Controls & Electrical |
| 787 |
ICE525 |
Electrical Hazards, Energy Isolation Standards |
5 days |
Instrumentation, Controls & Electrical |
| 788 |
ICE526 |
Electrical Hazards & Safety Precautions |
5 days |
Instrumentation, Controls & Electrical |
| 789 |
ICE527 |
Electrical Installation in Hazardous Area |
5 days |
Instrumentation, Controls & Electrical |
| 790 |
ICE528 |
Electrical Installations & Maintenance |
5 days |
Instrumentation, Controls & Electrical |
| 791 |
ICE529 |
Electrical Motor Maintenance & Troubleshooting |
5 days |
Instrumentation, Controls & Electrical |
| 792 |
ICE530 |
Electrical Motors & MCC Panels Maintenance & Troubleshooting Practical |
5 days |
Instrumentation, Controls & Electrical |
| 793 |
ICE531 |
Electrical Power Distribution Systems Quality |
5 days |
Instrumentation, Controls & Electrical |
| 794 |
ICE532 |
Electrical Power Systems for non-Engineers |
5 days |
Instrumentation, Controls & Electrical |
| 795 |
ICE533 |
Electrical Protection System |
5 days |
Instrumentation, Controls & Electrical |
| 796 |
ICE534 |
Electrical Systems Design, Commissioning & Start Up |
5 days |
Instrumentation, Controls & Electrical |
| 797 |
ICE535 |
Fault Analysis in Electrical Networks & Distribution Cables |
5 days |
Instrumentation, Controls & Electrical |
| 798 |
ICE536 |
Faults Finding Techniques in Electrical Power System |
5 days |
Instrumentation, Controls & Electrical |
| 799 |
ICE537 |
Fiber Optics for Oil & Gas |
5 days |
Instrumentation, Controls & Electrical |
| 800 |
ICE538 |
Field Instruments & SMART Transmitters |
5 days |
Instrumentation, Controls & Electrical |
| 801 |
ICE539 |
Fiscal Metering Systems |
5 days |
Instrumentation, Controls & Electrical |
| 802 |
ICE540 |
Flow & Level Custody Measurement |
5 days |
Instrumentation, Controls & Electrical |
| 803 |
ICE541 |
Foundation Fieldbus Configuration, Installation & Commission |
5 days |
Instrumentation, Controls & Electrical |
| 804 |
ICE542 |
Generation, Transmission, Distribution, Protection & Operation of Power Systems |
5 days |
Instrumentation, Controls & Electrical |
| 805 |
ICE543 |
Generator Excitation Systems: (Design, Commissioning, Operation, Maintenance, Performance Analysis, Testing, Tuning,
Repair & Troubleshooting) |
10 days |
Instrumentation, Controls & Electrical |
| 806 |
ICE544 |
Generator Operations, Maintenance, Control, Testing & Troubleshooting |
5 days |
Instrumentation, Controls & Electrical |
| 807 |
ICE545 |
HV/LV Motors Maintenance & Protection. |
5 days |
Instrumentation, Controls & Electrical |
| 808 |
ICE546 |
Harmonics, Power Quality & its Effects on Gas Insulated Switchgears (GIS) |
5 days |
Instrumentation, Controls & Electrical |
| 809 |
ICE547 |
High & Medium Voltage Substation Design, Testing & Maintenance |
5 days |
Instrumentation, Controls & Electrical |
| 810 |
ICE548 |
High Integrity Protection |
5 days |
Instrumentation, Controls & Electrical |
| 811 |
ICE549 |
High Voltage Switchgear |
5 days |
Instrumentation, Controls & Electrical |
| 812 |
ICE550 |
HV Electrical Safety |
5 days |
Instrumentation, Controls & Electrical |
| 813 |
ICE551 |
HV Outdoor Equipment’s (CBS, CTS, VTS, CVTS, Disconnectors) Design & Testing |
5 days |
Instrumentation, Controls & Electrical |
| 814 |
ICE552 |
HV/LV Electrical Authorization |
5 days |
Instrumentation, Controls & Electrical |
| 815 |
ICE553 |
HVAC Technician Program |
5 days |
Instrumentation, Controls & Electrical |
| 816 |
ICE554 |
Industrial Automation Using PLC |
5 days |
Instrumentation, Controls & Electrical |
| 817 |
ICE555 |
Industrial Process Measurements |
5 days |
Instrumentation, Controls & Electrical |
| 818 |
ICE556 |
Instrumentation & Field Instruments Servicing |
5 days |
Instrumentation, Controls & Electrical |
| 819 |
ICE557 |
Instrumentation, Controls & Electrical Systems Overview |
5 days |
Instrumentation, Controls & Electrical |
| 820 |
ICE558 |
Isolation & Cancellation of Electrical Equipment (HV-MV-LV) |
5 days |
Instrumentation, Controls & Electrical |
| 821 |
ICE559 |
LV & HV Power System Protection |
5 days |
Instrumentation, Controls & Electrical |
| 822 |
ICE560 |
LV installation (MCC, Protection, Cables...) |
5 days |
Instrumentation, Controls & Electrical |
| 823 |
ICE561 |
Maintenance & Troubleshooting of UPS Systems (Uninterrupted Power Supply) & Battery Power Supplies |
5 days |
Instrumentation, Controls & Electrical |
| 824 |
ICE562 |
Maintenance of LV Switchgear |
5 days |
Instrumentation, Controls & Electrical |
| 825 |
ICE563 |
Maintenance Reliability Best Practices Lowering Life Cycle Cost of Equipment |
5 days |
Instrumentation, Controls & Electrical |
| 826 |
ICE564 |
Math Operation for Short Circuit, Voltage Drop & Lighting Calculations |
5 days |
Instrumentation, Controls & Electrical |
| 827 |
ICE565 |
Medium Voltage & High Voltage Switchgear Operations & Maintenance |
5 days |
Instrumentation, Controls & Electrical |
| 828 |
ICE566 |
MLE Process Training Modified LUDZACK-ETTINGER (MLE) Process |
5 days |
Instrumentation, Controls & Electrical |
| 829 |
ICE567 |
Modern & Advanced Power System Protective Relaying & Relay Testing |
5 days |
Instrumentation, Controls & Electrical |
| 830 |
ICE568 |
Modern Electric Power Systems: Design, Modeling, Analysis & Problem Solving |
5 days |
Instrumentation, Controls & Electrical |
| 831 |
ICE569 |
Motor Control Centers & Variable Frequency Drives |
5 days |
Instrumentation, Controls & Electrical |
| 832 |
ICE570 |
Motors & Variable Speed Drives: (Selection, Applications, Operation, Diagnostic Testing, Protection, Control,
Troubleshooting & Maintenance) |
5 days |
Instrumentation, Controls & Electrical |
| 833 |
ICE571 |
Motors Protection & Maintenance |
5 days |
Instrumentation, Controls & Electrical |
| 834 |
ICE572 |
MV Motors, Speed Driver & Generator |
5 days |
Instrumentation, Controls & Electrical |
| 835 |
ICE573 |
Numerical Protection Relay Ops, Testing & TS |
5 days |
Instrumentation, Controls & Electrical |
| 836 |
ICE574 |
Operation & Maintenance of Electric Motors |
5 days |
Instrumentation, Controls & Electrical |
| 837 |
ICE575 |
Overhead Lines, Maintenance & Construction |
5 days |
Instrumentation, Controls & Electrical |
| 838 |
ICE576 |
PID Loop Development & Tuning |
5 days |
Instrumentation, Controls & Electrical |
| 839 |
ICE577 |
Pipeline Control Room Management |
5 days |
Instrumentation, Controls & Electrical |
| 840 |
ICE578 |
Pipeline Leak Detection |
5 days |
Instrumentation, Controls & Electrical |
| 841 |
ICE579 |
PLC Elementary & Control Loops |
5 days |
Instrumentation, Controls & Electrical |
| 842 |
ICE580 |
Power Distribution Systems Design, Operations & Planning |
5 days |
Instrumentation, Controls & Electrical |
| 843 |
ICE581 |
Power Factor Improvement |
5 days |
Instrumentation, Controls & Electrical |
| 844 |
ICE582 |
Power Generation & Distribution |
5 days |
Instrumentation, Controls & Electrical |
| 845 |
ICE583 |
Power System Blackouts (Cause & Preventive Measures) |
5 days |
Instrumentation, Controls & Electrical |
| 846 |
ICE584 |
Power System Protection & Coordination |
5 days |
Instrumentation, Controls & Electrical |
| 847 |
ICE585 |
Power Transformers Operation, Maintenance & Protection |
5 days |
Instrumentation, Controls & Electrical |
| 848 |
ICE586 |
Practical Distribution Transformers - Operation & Maintenance |
5 days |
Instrumentation, Controls & Electrical |
| 849 |
ICE587 |
Practical Grounding, Bonding, Shielding & Surge Protection |
5 days |
Instrumentation, Controls & Electrical |
| 850 |
ICE588 |
Practical Process Control Best Practices in PID Control, Loop Tuning & Analysis |
5 days |
Instrumentation, Controls & Electrical |
| 851 |
ICE589 |
Process Control & Safeguarding |
5 days |
Instrumentation, Controls & Electrical |
| 852 |
ICE590 |
Process Measurement, Instrumentation & Process Control |
5 days |
Instrumentation, Controls & Electrical |
| 853 |
ICE591 |
Programmable Logic Controller PLC |
5 days |
Instrumentation, Controls & Electrical |
| 854 |
ICE592 |
Project Engineering Principles & skills |
5 days |
Instrumentation, Controls & Electrical |
| 855 |
ICE593 |
Protection Relays Maintenance & Application |
5 days |
Instrumentation, Controls & Electrical |
| 856 |
ICE594 |
Refractory Design, Installation, Inspection, & Repair |
5 days |
Instrumentation, Controls & Electrical |
| 857 |
ICE595 |
Safe Operation, Maintenance & Troubleshooting of Circuit Breakers & Switchgears |
5 days |
Instrumentation, Controls & Electrical |
| 858 |
ICE596 |
Supervisory Control & Data Acquisition (SCADA) |
5 days |
Instrumentation, Controls & Electrical |
| 859 |
ICE597 |
Temperature Measurements |
5 days |
Instrumentation, Controls & Electrical |
| 860 |
ICE598 |
THAMCO High Voltage Switchgears |
5 days |
Instrumentation, Controls & Electrical |
| 861 |
ICE599 |
Transformer Operation & Troubleshooting |
5 days |
Instrumentation, Controls & Electrical |
| 862 |
ICE600 |
Transformer Protection & Maintenance |
5 days |
Instrumentation, Controls & Electrical |
| 863 |
ICE601 |
Transmission Line Maintenance, Patrolling & Washing |
5 days |
Instrumentation, Controls & Electrical |
| 864 |
ICE602 |
Troubleshooting & Maintenance of Power Distribution Equipment |
5 days |
Instrumentation, Controls & Electrical |
| 865 |
ICE603 |
Troubleshooting, Maintenance & Protection of AC Electrical Motors & Drives |
5 days |
Instrumentation, Controls & Electrical |
| 866 |
ICE604 |
Uninterruptible Power Supplies (UPS) |
5 days |
Instrumentation, Controls & Electrical |
| 867 |
ICE605 |
UPS Systems, Battery Chargers Maintenance & Troubleshooting |
5 days |
Instrumentation, Controls & Electrical |
| 868 |
ICE606 |
Value Engineering Skills |
5 days |
Instrumentation, Controls & Electrical |
| 869 |
ICE607 |
Variable Frequency Drives |
5 days |
Instrumentation, Controls & Electrical |
| 870 |
ICE608 |
Variable Speed Motor Drives |
5 days |
Instrumentation, Controls & Electrical |
| 871 |
ICE513 |
Electric Distribution System Equipment Operation: Transformers, Switchgears, Circuit Breakers, Relays, Capacitors, Surge Arresters |
10 days |
Instrumentation, Controls & Electrical |
| 872 |
GGP615 |
2D & 3D Seismic Interpretation |
5 days |
Geology, Geophysics & Petro-physics |
| 873 |
GGP616 |
3D Seismic Attributes for Reservoir Characterization |
5 days |
Geology, Geophysics & Petro-physics |
| 874 |
GGP617 |
Advanced Practices in Exploration & Development of Unconventional Resources |
5 days |
Geology, Geophysics & Petro-physics |
| 875 |
GGP618 |
Advanced Seismic Stratigraphy: A Sequence – Wavelet Analysis Exploration |
5 days |
Geology, Geophysics & Petro-physics |
| 876 |
GGP619 |
Analysis of Structural Traps in Extensional Settings |
5 days |
Geology, Geophysics & Petro-physics |
| 877 |
GGP620 |
Applied Biostratigraphy & Sequence Stratigraphy in Oil Exploration & Development |
5 days |
Geology, Geophysics & Petro-physics |
| 878 |
GGP621 |
Applied Rock Mechanics |
5 days |
Geology, Geophysics & Petro-physics |
| 879 |
GGP622 |
Applied Seismic Anisotropy for Fractured Reservoir Characterization |
5 days |
Geology, Geophysics & Petro-physics |
| 880 |
GGP623 |
AVO, Inversion & Attributes: Principles & Applications |
5 days |
Geology, Geophysics & Petro-physics |
| 881 |
GGP624 |
Basic Geophysics |
5 days |
Geology, Geophysics & Petro-physics |
| 882 |
GGP625 |
Basic Petroleum Geology |
5 days |
Geology, Geophysics & Petro-physics |
| 883 |
GGP626 |
Basin Analysis Workshop: An Integrated Approach to the Exploration & Evaluation of Conventional & Unconventional Resources |
5 days |
Geology, Geophysics & Petro-physics |
| 884 |
GGP627 |
Cased Hole Formation Evaluation |
5 days |
Geology, Geophysics & Petro-physics |
| 885 |
GGP628 |
Clastic Reservoir Characterization & Sequence Stratigraphy |
5 days |
Geology, Geophysics & Petro-physics |
| 886 |
GGP629 |
Compressional & Transpressional Structural Styles |
5 days |
Geology, Geophysics & Petro-physics |
| 887 |
GGP630 |
Computer-Based Subsurface Mapping |
5 days |
Geology, Geophysics & Petro-physics |
| 888 |
GGP631 |
Coring & Conventional Core Analysis |
5 days |
Geology, Geophysics & Petro-physics |
| 889 |
GGP632 |
Deep-water Turbidity Depositional Systems & Reservoirs |
5 days |
Geology, Geophysics & Petro-physics |
| 890 |
GGP633 |
Fluvial Sedimentation: Principles & Application |
5 days |
Geology, Geophysics & Petro-physics |
| 891 |
GGP634 |
Foundations of Petro-physics |
5 days |
Geology, Geophysics & Petro-physics |
| 892 |
GGP635 |
Geochemical Techniques for Solving Reservoir Management & Field Development Problems |
5 days |
Geology, Geophysics & Petro-physics |
| 893 |
GGP636 |
Geochemistry: Tools for Effective Exploration & Development |
5 days |
Geology, Geophysics & Petro-physics |
| 894 |
GGP637 |
Geological & Geophysical Characterization of Heavy Oil Reservoirs |
5 days |
Geology, Geophysics & Petro-physics |
| 895 |
GGP638 |
Geo-mechanics for Heavy Oil |
5 days |
Geology, Geophysics & Petro-physics |
| 896 |
GGP639 |
Geophysics Progression Matrix |
5 days |
Geology, Geophysics & Petro-physics |
| 897 |
GGP640 |
Integrated Carbonate Reservoir Characterization |
5 days |
Geology, Geophysics & Petro-physics |
| 898 |
GGP641 |
Integrated Formation Evaluation in Clastic & Carbonate Reservoirs |
5 days |
Geology, Geophysics & Petro-physics |
| 899 |
GGP642 |
Integrated Petro-physics for Reservoir Characterization |
5 days |
Geology, Geophysics & Petro-physics |
| 900 |
GGP643 |
Integration of Rocks, Log & Test Data |
5 days |
Geology, Geophysics & Petro-physics |
| 901 |
GGP644 |
Introduction to Fiber Optics for Well Surveillance |
5 days |
Geology, Geophysics & Petro-physics |
| 902 |
GGP645 |
Introduction to Geo-Mechanics for Unconventional Reservoirs |
5 days |
Geology, Geophysics & Petro-physics |
| 903 |
GGP646 |
Introduction to Seismic Stratigraphy: A Basin Scale Regional Exploration |
5 days |
Geology, Geophysics & Petro-physics |
| 904 |
GGP647 |
LWD & MWD Tool Physics & Application |
5 days |
Geology, Geophysics & Petro-physics |
| 905 |
GGP648 |
Mapping Subsurface Structures |
5 days |
Geology, Geophysics & Petro-physics |
| 906 |
GGP649 |
Mud Logging |
5 days |
Geology, Geophysics & Petro-physics |
| 907 |
GGP650 |
Naturally Fractured Reservoirs: Geologic & Engineering Analysis |
5 days |
Geology, Geophysics & Petro-physics |
| 908 |
GGP651 |
Nuclear Magnetic Resonance (NMR) Petro-physics |
5 days |
Geology, Geophysics & Petro-physics |
| 909 |
GGP652 |
Operations Geology |
5 days |
Geology, Geophysics & Petro-physics |
| 910 |
GGP653 |
Petroleum Geology for Non-Geologists |
5 days |
Geology, Geophysics & Petro-physics |
| 911 |
GGP654 |
Petroleum Systems Analysis |
5 days |
Geology, Geophysics & Petro-physics |
| 912 |
GGP655 |
Petro-physical Properties: Core, Log & Test Data Integration |
5 days |
Geology, Geophysics & Petro-physics |
| 913 |
GGP656 |
Petro-physics of Unconventional Reservoirs |
5 days |
Geology, Geophysics & Petro-physics |
| 914 |
GGP657 |
Petro-physics Progression Matrix |
5 days |
Geology, Geophysics & Petro-physics |
| 915 |
GGP658 |
Production Geology for other Disciplines |
5 days |
Geology, Geophysics & Petro-physics |
| 916 |
GGP659 |
Provenance & Diagenetic Studies of Sandstone Reservoirs |
5 days |
Geology, Geophysics & Petro-physics |
| 917 |
GGP660 |
Reservoir Quality Analysis of Sandstone & Carbonate Rock-Types |
5 days |
Geology, Geophysics & Petro-physics |
| 918 |
GGP661 |
Sandstone Reservoirs |
5 days |
Geology, Geophysics & Petro-physics |
| 919 |
GGP662 |
Sedimentology: from Introduction to Application |
5 days |
Geology, Geophysics & Petro-physics |
| 920 |
GGP663 |
Seismic Imaging of Subsurface Geology |
5 days |
Geology, Geophysics & Petro-physics |
| 921 |
GGP664 |
Seismic Interpretation & Basin Analysis of Rift Basin Systems |
5 days |
Geology, Geophysics & Petro-physics |
| 922 |
GGP665 |
Seismic Positioning Data Management |
5 days |
Geology, Geophysics & Petro-physics |
| 923 |
GGP666 |
Seismic Velocities & Depth Conversion |
5 days |
Geology, Geophysics & Petro-physics |
| 924 |
GGP667 |
Sequence Stratigraphy: An Applied Workshop |
5 days |
Geology, Geophysics & Petro-physics |
| 925 |
GGP668 |
Shallow & Deep Marine Sedimentation: Principles & Application |
5 days |
Geology, Geophysics & Petro-physics |
| 926 |
GGP669 |
Structural & Stratigraphic Interpretation of Dip-meters & Borehole-Imaging Logs |
5 days |
Geology, Geophysics & Petro-physics |
| 927 |
GGP670 |
Structural Styles in Petroleum Exploration |
5 days |
Geology, Geophysics & Petro-physics |
| 928 |
GGP671 |
Use of Full Azimuth Seismic & Micro-seismic for Unconventional Plays |
5 days |
Geology, Geophysics & Petro-physics |
| 929 |
GGP672 |
Well Construction / Drilling Progression Matrix |
5 days |
Geology, Geophysics & Petro-physics |
| 930 |
GGP673 |
Well Log Interpretation |
5 days |
Geology, Geophysics & Petro-physics |
| 931 |
GGP674 |
Wireline Formation Testing & Interpretation |
5 days |
Geology, Geophysics & Petro-physics |
| 932 |
WDR680 |
Acidizing Application & Sandstone Carbonate |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 933 |
WDR681 |
Advanced Casing Design |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 934 |
WDR682 |
Advanced Drilling Best Practices |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 935 |
WDR683 |
Advanced Well Integrity Management |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 936 |
WDR684 |
Advanced Well Log Interpretation |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 937 |
WDR685 |
Advanced Well Test |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 938 |
WDR686 |
Applied Reservoir Engineering & Management |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 939 |
WDR687 |
Basic Cased Hole Logging Tools |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 940 |
WDR688 |
Basic Drilling Technology |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 941 |
WDR689 |
Basic Reservoir Engineering |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 942 |
WDR690 |
Capillarity in Rocks |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 943 |
WDR691 |
Casing & Cementing |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 944 |
WDR692 |
Casing Design Workshop |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 945 |
WDR693 |
Cementing Planning, Operation & Evaluation |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 946 |
WDR694 |
Cementing Technologies |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 947 |
WDR695 |
Chemical Enhanced Oil Recovery Fundamentals |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 948 |
WDR696 |
Coiled Tubing Operations |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 949 |
WDR697 |
Data Analytics for Drilling Optimization |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 950 |
WDR698 |
Decline Curve Analysis & Diagnostic Methods for Performance Forecasting |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 951 |
WDR699 |
Deepwater Well Engineering |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 952 |
WDR700 |
Directional, Horizontal & Sidetrack Drilling |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 953 |
WDR701 |
Directional, Horizontal, & Multilateral Drilling |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 954 |
WDR702 |
Drill String Design & Optimization |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 955 |
WDR703 |
Drilling Fluids Technology |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 956 |
WDR704 |
Enhanced Oil Recovery (EOR) |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 957 |
WDR705 |
Enhanced Oil Recovery with Gas Injection |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 958 |
WDR706 |
Essentials of Surface Well Test Design & Execution |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 959 |
WDR707 |
Exploration Valuation & Decision Analysis |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 960 |
WDR708 |
Extended Reach Drilling (ERD) |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 961 |
WDR709 |
Fractured Reservoir & Its Impact on Enhanced Oil Recovery |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 962 |
WDR710 |
Fundamentals of Casing Design |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 963 |
WDR711 |
Fundamentals of Exploration & Production |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 964 |
WDR712 |
Fundamentals of Formation Evaluation |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 965 |
WDR713 |
Fundamentals of Reservoir Engineering |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 966 |
WDR714 |
Gas Reservoir Management |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 967 |
WDR715 |
History Matching & Reservoir Optimization |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 968 |
WDR716 |
Horizontal & Multilateral Wells: Analysis & Design |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 969 |
WDR717 |
Horizontal Well Performance & Optimization |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 970 |
WDR718 |
Integrated Formation Evaluation & Reservoir Characterization |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 971 |
WDR719 |
Integrated Reservoir Modeling |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 972 |
WDR720 |
Managed Pressure Drilling |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 973 |
WDR721 |
Managing Natural & Artificial Flowing Wells |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 974 |
WDR722 |
Managing Wellsite Operations |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 975 |
WDR723 |
Naturally Fractured Reservoirs: Geologic & Engineering Analysis |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 976 |
WDR724 |
Offshore Drilling Operations |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 977 |
WDR725 |
Oil & Gas Reserves Evaluation |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 978 |
WDR726 |
Oil Water Treatment Technology |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 979 |
WDR727 |
Open & Cased Hole Log Interpretation |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 980 |
WDR728 |
Petroleum Geo-mechanics |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 981 |
WDR729 |
PVT (Pressure-Volume-Temperature) Properties of Reservoir Fluids |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 982 |
WDR730 |
Reservoir Characterization: A Multi-Disciplinary Team Approach |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 983 |
WDR731 |
Reservoir Engineering for Other Disciplines |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 984 |
WDR732 |
Reservoir Engineering Progression Matrix |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 985 |
WDR733 |
Reservoir Fluid Properties: Preparation for Reservoir Engineering |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 986 |
WDR734 |
Reservoir Management for Unconventional Reservoirs |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 987 |
WDR735 |
Reservoir Modeling of Heavy Oil Resources |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 988 |
WDR736 |
Sand Control Techniques |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 989 |
WDR737 |
Stuck Pipe Prevention & Fishing Operations |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 990 |
WDR738 |
Sucker Rod Pump |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 991 |
WDR739 |
Uncertainties & Geo-statistics for Subsurface Managers |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 992 |
WDR740 |
Unconventional Resource & Reserve Evaluation |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 993 |
WDR741 |
Underbalanced Drilling |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 994 |
WDR742 |
Water Flooding Management |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 995 |
WDR743 |
Well Completion Design |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 996 |
WDR744 |
Well Design & Engineering |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 997 |
WDR745 |
Well Integrity Technologies |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 998 |
WDR746 |
Well Interventions |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 999 |
WDR747 |
Well Log Data Management |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 1000 |
WDR748 |
Well Testing: Design & Analysis |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 1001 |
WDR749 |
Well, Reservoir & Facility Management |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 1002 |
WDR750 |
Wireline & Logging-while-Drilling (LWD) Log Quality Control & its Impact on Interpretation |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 1003 |
WDR751 |
Work-Over & Completion Operations |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |
| 1004 |
WDR752 |
Xmas Trees & Well Heads |
5 days |
WELL CONSTRUCTION / DRILLING & Completion/ RESERVOIR ENGINEERING |